The brief
An active construction frontage inside a working retail development, roughly 39 m long and 3.6 m high. The existing board-up had to move, a new section had to be built, and the whole run needed to be covered in graphics — without closing the walkway alongside it.
What we did
- 01Relocated 139.40 sqm of existing board-up to the new line
- 02Built 4.46 sqm of new hoarding in ½-inch ply on vertical and horizontal studs
- 03Designed, printed and installed 141.26 sqm of tarpaulin graphics over the full run
- 04Sequenced the three trades so the frontage was never fully open
Specification
- 139.40 sqm board-up relocated
- 141.26 sqm printed graphics
- ½-inch ply on vertical and horizontal studs
- Design, print and installation in one scope