Batangas pylon signage
- Client
- DN Steel
- Sector
- Industrial
- Location
- Batangas
- Period
- 2024–2025
The brief
A steel manufacturer's site needed pylon signage, and the job ran over eighteen months rather than eighteen days — the sort of work where signage, structure and the site masterplan all have to agree with each other.
What we did
- 01Surveyed the site and mapped the pylon locations against the masterplan
- 02Quoted a condition inspection of the existing signage before proposing new work
- 03Coordinated pylon structural details with the engineering contact
- 04Issued the final production files to the fabrication partner
Specification
- Structural detail coordination
- Signage condition inspection
- Site and location survey
- Production files issued to fabrication